Summary and Status: After we moved RHRS and ramped our magnet up (after Hall C target cool down), late swing shift yesterday, we had good production for several hours. In the morning, the RQ2 tripped because liquid levels dropped below the interlock trip point and hence dumped the power supply. It turned out that the problem was with the liquid level monitoring electronics circuit and tech team quickly (< 1 hr) fixed it (using the redundant probe). Everything is stable since then.
We continued taking data for both arms whole day, the production was particularly good during swing shift.
Plan: We will continue taking data for both arms as it is (LHRS: kin-11; RHRS: kin-16). If everything goes smooth, by (or around) the beginning of day shift we will move L-HRS to kin-13 (31.73 deg). And there may be another cake at the counting hall! :-)
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3521709
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20180127/7f22a04d/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IMG_20180127_005044.jpg
Type: image/jpeg
Size: 167920 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20180127/7f22a04d/attachment-0001.jpg>
More information about the Halla_running
mailing list