[Halla_running] [Revised Logentry] RC Daily Run Summary
jbane at jlab.org
jbane at jlab.org
Fri Nov 9 09:05:02 EST 2018
Logentry Text:
--
News from the 8AM meeting:
-Beam studies and Recovery have switched,
-A tentative request for a controlled access to start around 9 on Monday during recovery
-The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan.
Summary for last 24 hours.
-Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day.
- A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194
-Old firmware might be the cause, shift is 4ns https://logbooks.jlab.org/entry/3623252
Reminder:
-Pay attention to the beam stability (BPMs, energy lock/FFB) and raster.
- Check the truck ramp door indicator (orange cone in the camera screen) from time to time
-We are in need of shift workers, please help us out https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?expe...
Today's Plan-
Continue to take data on 3H. Runs are about 40 minutes/ 40e4 uC
Will change to the Hydrogen Kinematics on the LHRS and take data on Hydrogen
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3623445
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20181109/5f318270/attachment.html>
More information about the Halla_running
mailing list