[Halla_running] [New Logentry] Hall-A Status and Plan
yez at jlab.org
yez at jlab.org
Wed Oct 3 08:35:02 EDT 2018
Logentry Text:
--
We are smoothly taking production in the x>1 kinematic setting through rest of the week and move into x>2 kinematic for the rest of the beam time. We finished the boiling study yesterday and we basically have finished all major calibration runs, expect BCM study when the beam is good, for example, this coming Friday when D and C are down for few hours. Meanwhile, on the HRS-R arm, we will finalize a plan to take some parasitic runs for other physics like Duality.
The BPM-A/B Y signals are still under investigation (although they don't stop us from taking data), and our parity colleagues (Cameron Clarke, Ciprian Gal and Bob Micheals etc.) are working with some experts from ACC site and helping us to look into the issues. We skipped the RF recovery yesterday and the next one is planed to be on next Tuesday. We have some detector checks to be done (PRJ2-1 fluctuation signal) as well as the issue on the BPM-Y, during the down time.
Shift schedule looks good but we need shift workers to cover the weekend and owl shifts. Just a reminder, Each weekend-shift counts as 1.5 and an owl shift counts as 2. Highly appreciate our collaborators to cover these empty spots.
Zhihong Ye, RC (and handing over to Florian Hauenstein this afternoon).
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3603274
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20181003/4d3b40a2/attachment.html>
More information about the Halla_running
mailing list