[Halla_running] [New Logentry] Status update

sanghwa at jlab.org sanghwa at jlab.org
Tue Aug 25 09:20:03 EDT 2020


Logentry Text:
--
We continued running production, collected ~3.1C from the swing and owl.

During the swing shift, we were off for a couple of hours to get Hall C back up. Our beam was restored around midnight, production resumed. The trip rates were a bit higher than last few nights, otherwise smooth running.

MCC took the beam away at 8:30 this morning. There will be a few hours of downtime for maintenance. Current estimation of the downtime is ~2hrs. In the meantime, we will have controlled access for the LHRS VDC work.

Planned work during the access:
Jack - LHRS VDC power supply
Ciprian - to switch the detector mode (upstream det, ATs)

Once the LHRS work is done, we will take the Qsq measurement. After that, we will have an escorted access to switch detector mode back to integrating. The rest of the plan is production, production, production.

We will have our daily experiment meeting at 3:30 pm:  https://bluejeans.com/256205934


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3833965
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20200825/93fd0a73/attachment.html>


More information about the Halla_running mailing list