Logentry Text:
--
Production went smoothly during yesterday's day shift. After yesterday's beam study ( done at 20:40), MCC found out that the1H04B harp was inoperative while we were following the procedure of restoring the beam on our target. The 1H04A harp was reading A (305um,320um) (https://logbooks.jlab.org/entry/3844189), which is consistent with recent configurations. There is no indication to show that the beam spot is too small at the target (<100um). So we feel confident to proceed for last night. Due to the 2L23-5 Solenoid Low Fault, the beam was off about 3.5 hours during today's owl shift. The I&C group has been debugging the 1H04B harp issue since the 8:00am MCC meeting. They thought that it might need to replace the pre-amplifier. At 9:27 am, the beam was off due to a vacuum problem in the South Linac. RadCon started a survey at 9:53 during the beam off period. Hall A is under control access now. Currently I&C experts are inside the hall to work on the 1H04B iss!
 ue. (Hall A full survey https://logbooks.jlab.org/entry/3844513)
 
The plan is to continue production after fixing the harp 1H04B. The pedestal calibration will be taken during today's swing shift.

We will have our usual meeting at 3:30 PM today. Bluejeans link : https://bluejeans.com/256205934 

Ye Tian 
(Hall A Run Coordinator)

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3844533
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20200909/4cbc851b/attachment.html>


More information about the Halla_running mailing list