Logentry Text:
--
Yesterday, the production data taking for SBS 70% (Run plan https://logbooks.jlab.org/entry/3974004) was completed OWL/DAY/SWING and cosmic runs were taken for SBS50% and SBS100% while the beam was down for HallB pass change.  The beam was shut off for beam studies at 7:45am today. The Hall is in controlled access and is expected to remain in controlled access through tomorrow mid-morning.  Beam is expected to return tomorrow between noon-4pm (mid DAY to end of DAY shift). 

Presently in the HallA, the ted BB DAQ is being surveyed by Radcon for removal by collaboration later this afternoon. Jack et al. are doing SBS work (there has been an SBS spike issue). GRINCH folks have checked some HV's and need to trace a cable  once the SBS work is done for the day.

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3977061
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20220125/9fede72c/attachment.html>


More information about the Halla_running mailing list