[Halla_running] [New Logentry] RC update and run plan for 17 October - 18 October
pking at jlab.org
pking at jlab.org
Mon Oct 17 21:35:01 EDT 2022
Logentry Text:
--
We have just started running on the He-3 cell. The rough polarization is 27%.
We've been stepping the current up to get a sense of beam stability; we'd been up to 25uA as I posted this.
=== Run plan for overnight into the morning ===
If beam is down due to tuning, move to the "no target" position, and follow this procedure to verify the spot size: https://sbs.jlab.org/wiki/index.php/HOW_TOs#If_beam_has_been_down_due_to_machine_tuning
After doing the spot size check, you will need to restore the raster before putting the He-3 cell back into the beam; use this procedure: https://sbs.jlab.org/wiki/index.php/HOW_TOs#How_to_ask_MCC_to_set_the_desired_raster_size_of_6_mm
1) He-3 runs, at 30uA of beam current. Use ps1==8, ps3==0, all others -1. Take two 1-hour runs.
2) Move the target to the pickup coil position, and the TO should run an NMR sweep to measure the polarization.
3) Move back to the He-3 cell position, and repeat steps (1), (2), and (3). We'll decide tomorrow morning about increasing the beam current.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4061744
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20221017/ed38ff6d/attachment.html>
More information about the Halla_running
mailing list