[Halla_running] RC update, 01/19

Iuliia Skorodumina skorodum at jlab.org
Thu Jan 19 19:41:51 EST 2023


The high current push was in action the whole Day Shift (01/19) and was successful. Now 45 uA can be delivered to Hall A. The Summary of the high current push: https://logbooks.jlab.org/entry/4113138 .

Swing Shift (01/19). The high current push was complete around 17:30, after which the beam checkout was resumed.

Tomorrow (Friday, 01/20) MCC plans the accelerator repair work (see PD Update https://logbooks.jlab.org/entry/4113148). The work is scheduled to start at 7:15am and continue up to the end of the Day Shift. The hall will go to the Controlled Access.

==Work in the hall during the Controlled Access (01/20)==

* GEM work, which includes plugging in the loose cable https://logbooks.jlab.org/entry/4113050
* HCAL work. Jiwan will continue troubleshooting noisy channels https://logbooks.jlab.org/entry/4112681
* Timing Hodoscope problematic channel (Ralph Marinaro)
* anything else?

Best regards,
Iuliia Skorodumina,
Hall A RC
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20230120/17ed29af/attachment.html>


More information about the Halla_running mailing list