The configuration change is going as planned:
* the BB has been changed and survey&alignment confirmed we are in the right position.
* the target group is doing field measurements right now
* at noon survey&alignment will come in to verify the HCAL position (we received new tolerances - 1inch in position- from Bogdan)
* if all goes well we may be able to take down the SBS GEMs so Holly can work on them this afternoon and we can reinstall them back tomorrow
Accelerator is going to support us with beam delivery on Friday. Their plan includes sending beam to the Hall A dumplette during the day tomorrow to allow them to make sure the 3pass separator works as expected.
*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-
We will have the regular RC meeting at 3:30pm in the Counting House conference room.
People can join remotely via:
https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4214060
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20231102/e7fae841/attachment.html>
More information about the Halla_running
mailing list