MCC is retuning the machine. As of now the beam at the Hall A dumplette is still pretty large: https://logbooks.jlab.org/entry/4280905.

Dave Meekins started the target cool down in the morning. He is at the point where he will start the condensation of the H loop. We will need a TO in the counting house around 6 pm. Then Dave will take a break and later on will condense the D loop. We should have the target fully ready by 1 am. At that point we will ask to go to beam permit.

MCC informed us that one of the Moller quads it's stuck on polarity switch. DC power is accessing Hall A to check it out: https://logbooks.jlab.org/entry/4280914.

We will have a RC meeting at 3:30 pm today on the second floor of the counting house and also on zoom. Please connect as we will have a lot to discuss in preparation for getting beam into the hall during the owl shift.

https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159




---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4280954
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20240416/fcd934d1/attachment.html>


More information about the Halla_running mailing list