[Halla_running] [New Logentry] RC summary Aug 11

jonesdc at jlab.org jonesdc at jlab.org
Mon Aug 11 10:40:01 EDT 2025


Logentry Text:
--
We had a fairly productive weekend. The beam quality was exceptional with low trip rate until Sunday swing when Ops returned the beam orbit to bring the trip rate back down. We had a few GEM related issues and are now running with several dead areas.
*GEM 0 backplane commented out https://logbooks.jlab.org/entry/4437313
*Two modules lost in FPP https://logbooks.jlab.org/entry/4438781
*MPD 24 commented out https://logbooks.jlab.org/entry/4439349

GEM experts will go into the Hall at 1PM under escorted access to swap out problematic MPDs. For now we will defer further work for maintenance day.
We started the weekend running at 15uA, but the fast dump of Hall B caused instabilities in the cryogenic coolant temperature and 3 times over Saturday and early Sunday the shift crew had to reduce beam current to 10uA due to the high power heater going to 0 and risking target boiling. 

During the day shift on Saturday Andrew found that running at 16uA instead of 15 had almost no impact on live time while running at 17uA significantly dropped the DAQ livetime. He decided to run at 16uA.
We have continued running with an ECal threshold of 65% and will stay there (at 16uA) until a full elastic calibration is available. 

Since yesterday's Day to today's owl:
* Total Accumulated Charge at Kin3 so far: 80.08 C (Goal: 100 C)
* Total Accumulated Charge at Kin3 since Friday : 2.86 C

Current Issues and Hall activities:
* ECal calibration constant and Trigger threshold

Shift Summaries:
*Day Shift Summary August 11, 2025 https://logbooks.jlab.org/entry/4439704
*Owl Shift Summary August 11, 2025 https://logbooks.jlab.org/entry/4439488
*Swing Shift Summary August 10,2025 https://logbooks.jlab.org/entry/4439211
*Day Shift Summary August 10, 2025 https://logbooks.jlab.org/entry/4439035
*Owl Shift Summary August 10, 2025 https://logbooks.jlab.org/entry/4438823
*Swing Shift Summary August 9, 2025 https://logbooks.jlab.org/entry/4438624
*Day Shift Summary August 9, 2025 https://logbooks.jlab.org/entry/4438405
*Owl Shift Summary August 9, 2025 https://logbooks.jlab.org/entry/4438167
*Swing Shift Summary August 8, 2025 https://logbooks.jlab.org/entry/4437945
*Day Shift Summary August 8, 2025 https://logbooks.jlab.org/entry/4437717

We will have our regular RC meeting today at 1pm.
RC Meeting:
* We will have RC meeting today at 1 pm in the conference room in the second floor of the CH and on Zoom.
* https://jlab-org.zoomgov.com/j/1616220064
* Meeting ID: 161 622 0064
* Passcode: 314159





---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4439795
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20250811/2544be7e/attachment.htm>


More information about the Halla_running mailing list