Dear Collaborators, 

Yesterday Don Jones and the team completed the Moller measurement during the day shift: https://logbooks.jlab.org/entry/4415222. A beam polarization of 87% was measured. Afterwards, we resumed production running which went relatively smooth overall up until we stopped at the beginning of the day shift today to take some zero-file C-foil data for GEM alignment. Here is the run plan for these runs: https://logbooks.jlab.org/entry/4415413. 
I anticipate the C-foil runs to take most of the day shift today and once they are finished we will go back to production running.

Concerns/issues during the last 24 hours:
-We had to stop run 5188 due to a shifting of HCal cluster ADC time (https://logbooks.jlab.org/files/2025/07/4415485/summaryPlots_5188_SBS_critical_noGEM.pdf). Peak had shifted to 90 ns from the desired 95 ns. Stopping the run, re-starting it following the usual steps fixed the issue and we did not see it again so far. Will have to keep an eye on it.
-ECal cluster energy started to show a smaller peak around 1.5 GeV during the middle of the run 518 (it was fine at the start of the run) and the experts instructed to stop the run and reset ECal vtp 1and 2 which fixed it.
-Swing shift SL had to restart CODA components and also call the DAQ on call Ching-Him to get the platform to restart one time.

Following is the summary of our status:
-Charge collected during the last ~24 hour period: 1.132 C
-Total accumulated charge at Kin3 so far: 51.50 C (Goal 100 C)
-Total accumulated charge at Kin3 since July 9 Day to July 11 Owl: 2.03 C
-Effective experiment running efficiency since July 9 Day shift (ABU tot)/(ABU tot + BANU tot): 92%

Plan for today:
-Finish zero-field optic runs during the day shift.
-Resume  production running with 20 uA on liquid H2.

Shift summaries:
07/10/2025 DAY https: https://logbooks.jlab.org/entry/4415200
07/10/2025 SWING: https://logbooks.jlab.org/entry/4415431
07/11/2025 OWL: https://logbooks.jlab.org/entry/4415626

BTAs:
07/10/2025 DAY https://logbooks.jlab.org/entry/4415406
07/10/2025 SWING https://logbooks.jlab.org/entry/4415613
07/11/2025 OWL https://logbooks.jlab.org/entry/4415812

We will have a RC meeting today at1 pm in the conference room in the second floor of the CH and on Zoom.
Zoom info:
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159

RC Hall-A
Anurudddha Rathnayake








---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4415899
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20250711/5ee10500/attachment.htm>


More information about the Halla_running mailing list