[Halla_running] [New Logentry] RC Daily Summary 05/07/2025

jpoudel at jlab.org jpoudel at jlab.org
Wed May 7 12:05:01 EDT 2025


Logentry Text:
--
MCC and Optics Experts tried to set-up beam for Hall-A till the end of swing shift yesterday, but the attempt was unsuccessful. So, they halted the beam tuning to hall-A for owl shift and started sending beam to halls B and D. Today is accelerator maintenance day, so beam went off in machine around 6:30 am. RadCon started surveying hall-A around 7:45 am, and we are in controlled access from 8:30 this morning. Different detector groups are accessing hall to look their systems, and we are planning to lock the hall this afternoon. Hall-A tech is required to unlock the SBS power supply before locking the hall. Details of RC summary is found at: https://sbs.jlab.org/wiki/index.php/RC_meeting_and_Run_Plan,_Wednesday,_May_7th

To discuss the updates and the upcoming plan, we will have RC meeting at 1:00 pm today on the second floor of Counting house and via zoom: https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4370880
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20250507/6fd9dd0f/attachment.htm>


More information about the Halla_running mailing list