[Halla_running] [New Logentry] Hall A RC Report - May 15th, 2025

arunts at jlab.org arunts at jlab.org
Thu May 15 11:15:02 EDT 2025


Logentry Text:
--
After wrapping up various detector related work in the hall, the Tech-On-Call was called in to remove the locks on the magnets. We took the hall from controlled to beam permit and waited for beam for quite some time. Beam was established to the hall sometime early in the morning (around 4:30 am), and after a quick checkout we went into a Moller measurement at 7:30 am. The plan for the rest of the day is to wrap up the Moller measurement, get back to production running at 10 uA, revisit the stability and capability of our detectors and then move to a higher beam current (15 uA?) if possible. Let's have an RC meeting at 1:30 pm today on the second floor of the counting house. 

Zoom link: https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159

ECAL channels HV adjustment: https://logbooks.jlab.org/entry/4375343
Issue with HCAL latency and window: https://logbooks.jlab.org/entry/4375531


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4375889
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20250515/0df57bc4/attachment.htm>


More information about the Halla_running mailing list