Logentry Text:
--
We backed out of the Moller measurement Q4 issues (https://logbooks.jlab.org/entry/4375927). The Moller group will wait to see what DC power has to say about the Q4 issues and we will reschedule another attempt sometime next week (https://logbooks.jlab.org/entry/4375942). After that, unfortunately, due to a broken compressor in the Hall A beam dump nitrogen system, we couldn't get any beam during swing and owl shifts. Facilities was able to address the issue (https://logbooks.jlab.org/entry/4376064) and we are currently waiting for MCC to get a go ahead to send us the beam. The plan is to get back to production running at 10 uA, revisit the stability and capability of our detectors and then move to a higher beam current (15 uA?) if possible. Let's have an RC meeting at 1:30 pm today on the second floor of the counting house.
Zoom link: https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4376411
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20250516/bb67499c/attachment.htm>
More information about the Halla_running
mailing list