<p dir="ltr">Not sure it went through correctly so I am reposting it.</p>
<p dir="ltr">keyword=RC summary 3/21</p>
<p dir="ltr">The Hall was in controlled access this morning to check some remaining issues. It will lock up around 1 pm. MCC will continue to optimize their optics and do some stability studies for rest of the Swing and Owl shifts tonight. We will need shift crew in the counting as planned. We plan to use a solid target during the day shift tomorrow (Sat) and being checking out HRS detectors. These checkouts will continue for rest of the weekend. There is also a plan to go through Compton chicane on Sunday (Day). We will have regular shifts starting day shift on Saturday (22nd). <br>
</p>