<div dir="auto">Moller measurement was performed last night. However, full spin dance is cancelled until further notice. Hall will be in controlled access shortly (before 10am or sooner) for the duration of DAY and SWING.<div dir="auto"><br></div><div dir="auto">Magnet work on the septum power supply and water leak to commence, as well as LQ2,3 faults.</div><div dir="auto"><br></div><div dir="auto">Thank you,</div><div dir="auto">-Caryn Palatchi</div></div>