<div dir="auto">Last night Compton chicane tuning was attempted, rates were significantly lowered, but the match into the hall was not right and spot sizes at Target were untenable. We received 150uA this morning after OPS tuned all night the match into the hall, as it was off design, and we could not place beam on target due to spot size limitations and inability to adjust hall quads to sufficiently correct spot size. This morning match into hall was sufficiently good to deliver beam on target. We ran pseudo-production runs for an hour or so, but the Aq width was 500-600ppm due to severe 10perecent clipping on A2 in injector which eventually was high enough to make it impossible to deliver 150uA without blm trips. Injector steering was done to reduce clipping initially but other trips occured downstream. 150uA of clipped beam was sent to the hall and a calibration run (pita scan) was performed with the noisy beam. The beam Aq RMS is greater than 50ppm increase due to clipping, its a 400ppm increase. This can lead to halo, cross correlations between charge and position, and impare PBQ. So these were not ABU's, but we still took data anyways. Injector folks came back around 2 and did some aperture clipping reduction. 150uA was sent to the Hall and Compton rates looked good until the beam tripped. There was an extended down period of approximately an hour during which match at 5MeV and injector chicane was assessed. PD informs that beam should be returning to HallA imminently. <div dir="auto"><br></div><div dir="auto">If Compton rates are decent through the chicane, we will perform Compton commissioning followed by production. If Compton rates are not able to be lowered in a reasonable amount of time, we will go straight through and continue production until HallC takes away the 1pass beam at some point this weekend, possibly Saturday Day-Swing.</div></div>