<div dir="auto"><div dir="auto">During yesterday DAY shift, injector adjustment to avoid 10percent beam losses detrimental to PQB and successful beam delivery of 150uA without BLM trips. During yesterday SWING, injector 5MeVmatch and chicane match, match into HallA, and getting Hall on design was done, resulting in sufficiently low Compton rates going straight through. Tuning through Compton chicane was not completed however, and given that HallC will be taking 1pass beam imminently, there is no plan to tune through the Compton chicane today. </div><div dir="auto"><br></div>Production runs were taken over OWL shifts. Some efficiency in running was lost due to FFB saturation. FFB BPMs had intermittent saturation issues not always resolved by gain search due to OPS gain search hi limit being set to the MAX at 3400 and gain tolerance set to 40percent, allowing gains to be set willy-nilly by FFB without showing OPS a 'gain fail' . Our alarms in HallA of course accurately reflected when bpms were saturating. DAY shift crew chief was informed the gain search limits and tolerances needed to be tightened up and now OPS can properly see a 'gain fail' when bpms saturate.<div dir="auto"><br></div><div dir="auto">At start of DAY shift this morning a detector alignment run was performed and it was clear the left dipole (unregulated, due to NMR being broke) needed adjustment. Yields in the left arm detectors were observed to be lower during OWL after a down period yesterday afternoon DAY. Earlier in the week the lhrs ioc was not communicating for a brief period due to some software group accidental activity. It may be that this affected the gaussmeter readback of the left dipole field. The readback of the gaussmeter was noted by the shift crew to be different from the nominal field running condition, so the left dipole setpoint current was adjusted until the gaussmeter read the nominal field value, as per ramping procedure previously employed. However, this adjustment clearly resulted in a reduction in the detector rate and in the peak position in a detector alignment check. Therefore, procedure has been modified such that rather than trusting the gaussmeter, we trust the current setpoint more, and if any change is made (or ioc rebooted), detector alignment check will be performed. Detector yields were found to be very sensitive to such changes and a good immediate indicator of any change (drift or otherwise) to the left dipole field.</div><div dir="auto"><br></div><div dir="auto">Production runs will continue through DAY into SWING. Approximately one slug of data (2C) has been collected since start of DAY yesterday (official start of PHYSICS) to now.</div><div dir="auto"><br></div><div dir="auto">HallC RC informed us that HallC will lockup mid swing. 5pass beam will be sent to HallC initially for a short time, during which time Hall A can continue receiving 1pass beam. Then HallA 1pass beam will be taken away and HallC will take 1pass beam with the HallC laser and without changing the HWien angle setting that HallA found as optimal -29.64. If HallC has any issues, 1pass beam will be returned to HallA while those issues are resolved. If HallC has no issues with 1pass beam at HWein -29.64, HallA will not receive further beam and the HWien will be adjusted to the setting hallC had at 1pass in December around -15. Assuming no issues in HallC, HallA will stop receiving beam late SWING. Radcon will survey the hall tomorrow morning and the hall will be placed in controlled access for Compton laser work Sunday. Monday morning the vacuum group also plan to come in the hall and examine an iron pump/gauge. The Hall should be locked up later Monday ready to receive beam. We plan to operate under the assumption that if HallA 1pass beam is taken Saturday OWL, beam will be returned 2 days later, no more. So we should plan to lockup the Hall Monday late DAY-SWING to be ready for Tuesday OWL.</div><div dir="auto"><br></div><div dir="auto">During HallC 1pass running, the hallC laser will be used and so the scripts used in December for hallC IA Aq feedback should work. We plan to keep a HallA TO to run Coda, HallC feedback and flipper. A modified flipper should be used Wich does not increment hallA slug number, or slug number should be manually set to 1000 while HallC has the beam.</div></div>