<html xmlns:o="urn:schemas-microsoft-com:office:office" xmlns:w="urn:schemas-microsoft-com:office:word" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns="http://www.w3.org/TR/REC-html40">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=Windows-1252">
<meta name="Generator" content="Microsoft Word 15 (filtered medium)">
<style><!--
/* Font Definitions */
@font-face
        {font-family:Century;
        panose-1:2 4 6 4 5 5 5 2 3 4;}
@font-face
        {font-family:"Cambria Math";
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Calibri;
        panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        font-size:11.0pt;
        font-family:"Calibri",sans-serif;}
a:link, span.MsoHyperlink
        {mso-style-priority:99;
        color:#0563C1;
        text-decoration:underline;}
.MsoChpDefault
        {mso-style-type:export-only;
        font-size:10.0pt;
        font-family:"Calibri",sans-serif;}
@page WordSection1
        {size:8.5in 11.0in;
        margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {page:WordSection1;}
--></style>
</head>
<body lang="EN-US" link="#0563C1" vlink="#954F72" style="word-wrap:break-word">
<div class="WordSection1">
<p class="MsoNormal">Hello all, </p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">On Saturday we completed our beam centering procedure and resumed running the GMN experiment in Hall A, and completed our optics program by the middle of swing shift. We resumed production data taking late in swing shift and this continues
 today. Beam quality has been an issue, with a high trip rate and limited current into Halls A and C with A at 4<sup>th</sup> pass and C at 5<sup>th</sup> pass. DAQ crashes have also been relatively frequent, but for the most part the recovery of the DAQ has
 been relatively quick. Apart from these issues, the experiment continues production running, cycling through runs on LH2, LD2, and the 15-cm dummy target. MCC is planning some extended troubleshooting of RF issues affecting machine performance either tomorrow
 or Tuesday, and this will be discussed at length in tomorrow’s 8 AM ops meeting. As this work will require sending high-current beam into Halls A and C, it would unfortunately not allow us to opportunistically access the hall to replace layer J2 in BigBite.
 This is the highest-priority item for the next extended downtime for opportunistic access during normal working hours.</p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">As it is Sunday and there are no urgent major issues to discuss, I am canceling the daily experiment meeting for today. We will resume tomorrow.</p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Sincerely,</p>
<p class="MsoNormal">Andrew </p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal"><span style="font-family:"Century",serif;color:black">Andrew Puckett<br>
Associate Professor, Physics Department<br>
University of Connecticut<br>
196 Auditorium Road, Unit 3046<br>
Storrs, CT 06269-3046<br>
Office phone: (860) 486-7137<br>
</span><a href="https://puckett.physics.uconn.edu/" title="https://puckett.physics.uconn.edu/"><span style="font-family:"Century",serif;color:#00006A">https://puckett.physics.uconn.edu</span></a><span style="font-family:"Century",serif;color:black"><br>
</span><a href="mailto:puckett@jlab.org" title="mailto:puckett@jlab.org"><span style="font-family:"Century",serif;color:#000064">puckett@jlab.org</span></a></p>
</div>
</body>
</html>