<div dir="ltr">We have still been running continuous production on He3. The target, Fringe, is still performing exceptionally well at ~53% polarization in beam and we have collected 1.4C in the last 24 hours. Unfortunately the beam continued to degrade overnight. Around 11 pm MC dropped form 45 uA and eventually settled on 30 uA until 8 am with many trips, <a href="https://logbooks.jlab.org/entry/4129589">https://logbooks.jlab.org/entry/4129589</a>. After taking the beam away for some investigations they found that it is an RF issue but they are having trouble getting RF experts available so currently they have decided to run lower current until tomorrow when more people are available, <a href="https://logbooks.jlab.org/entry/4129660">https://logbooks.jlab.org/entry/4129660</a>. Currently they are only able to run 10 uA to hall A and 10 uA to hall C without excessive trips.<br><br>Ongoing issues:<br>We are still waiting for a down time to fix the dead blocks in BBCal.<br>Jiwan will access the hall at the next opportunity to power cycle the crate and fix this issue. <a href="https://logbooks.jlab.org/entry/4128412">https://logbooks.jlab.org/entry/4128412</a><br><br>There are no major issues in the hall and we are mostly waiting for better beam quality so we will not have an RC meeting today. Feel free to contact me if anything needs to be discussed.<br><div><br></div><div>Best,<br>Sean</div></div>