<div dir="ltr">Hi all,<div><br></div><div>I got a short update on the dump repair this morning. It sounds like they are ready to deploy new alarms on Monday, but the water cleanup is still a work in progress. They have steps in place, but safely cleaning up that much contamination takes time. Unfortunately, the auxiliary pump was not turned on yesterday, which also adds time to getting the system running again.</div><div><br></div><div>I know that people would like to go into controlled, but without a clear date on beam, I will not be pushing too hard for that. I was told that I might get an actual date for beam on Monday. We'll see. I think we can make a more reasonable plan for the hall once we have a date.</div><div><br></div><div>Furthermore, the Wein angle will be set on Monday to 45.7 degrees. This is optimized for Halls B and C. Once Hall A is back online, the angle will be reoptimized. There will also be a pass change for Hall C happening during Monday day shift.</div><div><br clear="all"><div>Thank you all for your continued patience.</div><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><font size="4">Kate Evans</font></div><div dir="ltr">Graduate Research Assistant</div><div dir="ltr">The College of William & Mary Physics Department<br></div><div>Thomas Jefferson National Accelerator Facility</div><div>She/Her Pronouns</div><div dir="ltr"><div><br></div></div></div></div></div></div></div>