[Hallb-engineering] Bonus

Doug Tilles tilles at jlab.org
Mon Oct 12 14:51:40 EDT 2009


Bonus is out. The 1Na is still connected but off the beam line. The 
Rasters are pushed all the way back And the Bonus group said the 
detector  is fine were it is.
Doug :-)



More information about the Hallb-engineering mailing list