To All,
The Fwd Carriage is installed and connected.The downstream beam-line is
in and pumped down. The Bonus beamtube from the fast valve to the beam
tube window at the BOM is leaked tested and is fine. The Detector will
be installed along with 1Na and the Rasters and beam line on Monday
morning. Many thanks to all that have helped during this busy change
over Doug