[Hallb-engineering] Hall B Rad Con status

Doug Tilles tilles at jlab.org
Tue Dec 21 07:00:44 EST 2010


To All

Due the the Rad levels in the hall the Rapid Access system has been 
changed. There will now be a beam-line Rad survey for any entry in the 
hall for any reason. So please be patient due to the fact MCC will need 
to get a ARM to the hall for a survey.  Please give them as much notice 
as possible.



Doug Tilles







More information about the Hallb-engineering mailing list