[Hallb-engineering] Hall status
Doug Tilles
tilles at jlab.org
Wed Dec 22 14:37:20 EST 2010
To All
The hall is now down for the Holiday.
We are running down the Hall now.
On Thursday we will lock out PS and secure the LCW to the Mini T
Also the TPE people want to take the Detector down at the Apex for
cosmic runs over the shut down.
This also means it will need to be aligned again.
Larry W can you get a hold of the Alignment group and set up a time
after the Holiday. I do not know when you guys will be done with it and
be ready to install.
Doug
More information about the Hallb-engineering
mailing list