[Hallb-engineering] Testlift of HDice
Doug Tilles
tilles at jlab.org
Thu Feb 11 06:45:22 EST 2010
Andy,
We will not be able to do your test today due to the fact, we need to
use the crane for the retraction of the Region 3 Sector 3 Drift chamber.
This is due to the broken wire that needs to be removed and we need to
pull the chamber off of the bearings to allow a manlift to get in to the
inside of the drift chamber for surgery on the gas bag and wire removal,
We will have to reschedule. This is up to Volker and Dave on which has
the highest priority. :-( DOUG :-(