[Hallb-engineering] Testlift of HDice
Doug Tilles
tilles at jlab.org
Thu Feb 11 11:17:08 EST 2010
Yes! Right after the Eng. meeting.
Dr. A.M. Sandorfi wrote:
> Doug,
>
> Sorry, I didn't know that was a question.
> YES, we can do it tomorrow. Shall we plan on that?
>
> Andy
>
>
>
>
>
> On 2/11/10 10:25 AM, "Doug Tilles" <tilles at jlab.org> wrote:
>
>
>> At the bottom of this Email I asked if Fri was OK, is it?
>>
>> Dr. A.M. Sandorfi wrote:
>>
>>> Doug,
>>>
>>> Is it possible to fix a firm date? A contractor needs to do some
>>> modifications to the TC lift fixture for use in the ICE Lab. He was going to
>>> do it tomorrow (Friday). I can postpone him, but it's easier if there is a
>>> definite date.
>>>
>>> Andy
>>>
>>>
>>>
>>>
>>>
>>> On 2/11/10 10:03 AM, "Doug Tilles" <tilles at jlab.org> wrote:
>>>
>>>
>>>
>>>> Dr. A. Sandorfi User wrote:
>>>>
>>>>
>>>>> OK, when?
>>>>>
>>>>> Andy
>>>>>
>>>>>
>>>>>
>>>>>
>>>>> On 2/11/10 7:51 AM, "burkert" <burkert at jlab.org> wrote:
>>>>>
>>>>>
>>>>>
>>>>>
>>>>>> The chamber repair has priority.
>>>>>> Volker
>>>>>>
>>>>>>
>>>>>> Doug Tilles wrote:
>>>>>>
>>>>>>
>>>>>>
>>>>>>> Andy,
>>>>>>>
>>>>>>> We will not be able to do your test today due to the fact, we need to
>>>>>>> use the crane for the retraction of the Region 3 Sector 3 Drift
>>>>>>> chamber. This is due to the broken wire that needs to be removed and
>>>>>>> we need to pull the chamber off of the bearings to allow a manlift to
>>>>>>> get in to the inside of the drift chamber for surgery on the gas bag
>>>>>>> and wire removal, We will have to reschedule. This is up to Volker and
>>>>>>> Dave on which has the highest priority. :-( DOUG :-(
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>
>>>>>
>>>>>
>>>> We can try again on Fri. DOUG
>>>>
>>>>
>>>>
>>>>
>>>
>>>
>>
>
>
>
More information about the Hallb-engineering
mailing list