[Hallb-engineering] Good news

Doug Tilles tilles at jlab.org
Thu Feb 11 15:28:00 EST 2010


Doug Tilles wrote:
> Denny, David, Stephen did a great job locating and repairing the R3S3 
> Drift chamber. George has tested the repairs and they are putting it 
> back together now. We should be able to install Fri.Great job to all 
> involved.    Doug
>
> _______________________________________________
> Hallb-engineering mailing list
> Hallb-engineering at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hallb-engineering
>   





More information about the Hallb-engineering mailing list