[Hallb-engineering] FSD and beam line check out

Doug Tilles tilles at jlab.org
Wed Mar 10 05:39:10 EST 2010


To all

The beam line vacuum has been tested and all valves and gages work and 
have been tested back to the MCC.   DOUG :-)