[Hallb-engineering] Monday

Doug Tilles tilles at jlab.org
Mon Nov 15 06:32:27 EST 2010


Denny and David

Please put Alignment group black box on level one for Mini T alignment. 
Then there are two Argon techs here have them work with Krister to run 
535 cables for magnets. when Alignment is done put Saclay on the cart 
and be careful of target. Then look at DWG and put the next carts on the 
beamline

Calvin and Stephan

  have rad con check the tubes on the floor from the C^ detector  than 
take boxes to shipping
See mike Z on the hanging of the new Calorimeter support at the apex on 
the FWD carriage, and bring in the ODU calorimeter from warehouse