[Hallb-engineering] Dec 6 Tue

Doug Tilles tilles at jlab.org
Mon Dec 5 10:22:06 EST 2011


To All

The hall will go to Restricted access at 7:00am  we will be transferring 
all of the HDice hardware for making target materials back to the lab.
Also we need to change the bag going through the IC it is wrinkled in 
the bore and is in the way of the beam.

Andy will be there to go over the scope of work and assist.

Doug




More information about the Hallb-engineering mailing list