[Hallb-engineering] HDice Load tests

Doug Tilles tilles at jlab.org
Thu Jan 27 12:56:51 EST 2011


To All

All six of the Load tests for IBC cart, Hoz position and Vertical, IBC 
transport fixture and IBC cradles have been finished. All were fine, The 
information and Documentation has been logged into the system.  All 
documentation is also on the M drive under Hall-b eng. under Lift Plans, 
under Load Tests folder,HDice folder


Doug




More information about the Hallb-engineering mailing list