[Hallb-engineering] Hall Flooding

Doug Tilles tilles at jlab.org
Mon Jul 11 08:37:57 EDT 2011


To All


There will be a short delay in starting work in the Hall due to the 
flood on Fri night, as soon as the hall is cleaned we will begin work 
again. It looks as if the Ditches over flowed due to blockage.

Doug




More information about the Hallb-engineering mailing list