[Hallb-engineering] ESR start up
Doug Tilles
tilles at jlab.org
Mon Jul 18 09:59:42 EDT 2011
To All
The start up is around the 8th of Aug, But the plan for cooling to the
halls is still around the 15 of Aug.
More information about the Hallb-engineering
mailing list