[Hallb-engineering] Nitrogen boil off gas for the EEL
David Kashy
kashy at jlab.org
Fri May 27 08:04:10 EDT 2011
There is a discussion going on about piping boil-off gas from the test
lab LN2 dewar to the EEL. Is anyone interested in this?
Dave
More information about the Hallb-engineering
mailing list