[Hallb-engineering] Hall B Controlled access
Doug Tilles
tilles at jlab.org
Tue Jan 10 06:53:49 EST 2012
The Hall will be in Controlled access for the day starting at 9:00am for
about 8 to 10 hours. Please input a Blist or let me know if you plan to
work in the hall. The LCW system will be down around 9:00 am. All
magnets as well as Power Supplies will be off line for about 15 min. I
will bring everything back on line by 9:30.
"Hdice" there are new N2 Dewar's on the gas pad. Do you want them in the
Hall?
Doug
More information about the Hallb-engineering
mailing list