Anyone who is interested in the C^ move to TEDF we will start around
10am for the first one. at the Large door at TEDF.   Miller, Denny and I
are meeting at 8:30 at TEDF     Doug


The move of the first C^ detector from the Hall to the TEDF went smooth.  I would like to thank all the Tech staff for the great job.
  and a special thanks to Calvin for coming up with the idea of using the Hall C shield block tooling for the lift.  Not using the gantry from the ESB was a great help
and made the lift much safer for all involved.   Good job Calvin

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20120731/542d615e/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 000_0176.JPG
Type: image/jpeg
Size: 727582 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20120731/542d615e/attachment-0002.jpe>


More information about the Hallb-engineering mailing list