[Hallb-engineering] Last one to go
    Douglas Tilles 
    tilles at jlab.org
       
    Thu Jan 10 12:54:26 EST 2013
    
    
  
This is the last  TOF panel detector to be removed from the Hall. Starting on the 22 of this month the North Clam Shell will be removed and the 12 GeV project will start.
I would like to thank all of the Tech staff for the great job over the last 8 months.
On even a brighter note there have been no injures or safety issues during the entire project.
Doug Tilles