[Hallb-engineering] block removal for steel work installation

Douglas Tilles tilles at jlab.org
Mon Mar 11 14:36:16 EDT 2013


On Friday all hands for my guys and any volunteers will be unstacking the shield blocks from the tagger block house for the removal of 2 green shield blocks. Any help would be greatly appreciated.
The picture shows the blocks and it will need to go down to the green blocks. the second one shows the problem.


Doug 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 000_0626.JPG
Type: image/jpeg
Size: 960283 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20130311/eb33db14/attachment-0004.jpe>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 000_0625.JPG
Type: image/jpeg
Size: 955434 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20130311/eb33db14/attachment-0005.jpe>


More information about the Hallb-engineering mailing list