[Hallb-engineering] Pcal
    Douglas Tilles 
    tilles at jlab.org
       
    Thu Nov 14 14:42:18 EST 2013
    
    
  
To All:
Pcal number 5 and 6 are out of room 125 of the EEL. 5 is installed and 6 is on the floor ready for installation on Monday.
Doug 
    
    
More information about the Hallb-engineering
mailing list