[Hallb-engineering] Pcal sector 1

Douglas Tilles tilles at jlab.org
Mon Nov 18 13:56:56 EST 2013


To All:

We will be moving Pcal sector 1 from the ESB to Hall B on 11/19/13 for installation on Wed 11/20/13.
We will then be 50% on the Pcal installation and soon to be cabled.

Doug



More information about the Hallb-engineering mailing list