[Hallb-engineering] Sector4 FTOF 1b

Douglas Tilles tilles at jlab.org
Tue Feb 18 14:51:16 EST 2014


To All: Great news

The checks and repairs on Sector 4 FTOF 1 b are done and the lifting fixture has been installed. We will start the installation at 7:30 in the morning.

Doug



More information about the Hallb-engineering mailing list