[Hallb-engineering] The lead shield is in

Douglas Tilles tilles at jlab.org
Wed Nov 5 11:13:26 EST 2014


The installation of the lead bullet on the FWD carriage went off without a hitch. On to the Torus A-frame installation.
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 100_2181.JPG
Type: image/jpeg
Size: 1586217 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20141105/b85dd5d3/attachment-0004.jpe>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 100_2179.JPG
Type: image/jpeg
Size: 955546 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20141105/b85dd5d3/attachment-0005.jpe>


More information about the Hallb-engineering mailing list