[Hallb-engineering] Hall Lock up

Douglas Tilles tilles at jlab.org
Thu Nov 6 06:32:52 EST 2014


The Hall will lock up at 3:00 today for system checks, in preparation for beam this weekend. I will be On Call unless someone would rather have it. The systems on-line will be the LCW system and Vacuum as well as Power supply for the Tagger.



More information about the Hallb-engineering mailing list