[Hallb-engineering] Plans for weekend

Stepan Stepanyan stepanya at jlab.org
Wed Nov 12 15:24:21 EST 2014


Dear all,

We will lock up the Hall-B for beam delivery to the tagger dump on
Friday, November 14, after 4pm. The plan for weekend is following
a) establish CW beam to Hall-B tagger dump
b) commission orbit locks
c) calibrate BPMs to 200 nA
d) study beam profile at 2C21 and 2C24 harps for different (at least 2)
optics settings to validate optics models
e) study beam long term stability
f) study beam motion during beam trips

Hall will go to restricted access at 7am on Monday, November 17.

Shift schedule for weekend is attached, let me know asap if you see
a problem with it. Thanks to people who volunteered for the shifts.

Regards, Stepan
RC
-------------- next part --------------
A non-text attachment was scrubbed...
Name: comm_shifts Sheet2.pdf
Type: application/pdf
Size: 24174 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20141112/d25558e9/attachment-0002.pdf>


More information about the Hallb-engineering mailing list