[Hallb-engineering] Hall Lock up
Stepan Stepanyan
stepanya at jlab.org
Thu Apr 16 09:36:23 EDT 2015
Hello guys,
Please make sure helium bag on the tagger dump is intact.
Thanks, Stepan
On 4/16/15 6:43 AM, Douglas Tilles wrote:
> The Hall will lock up about 3:00 on Friday for beam for the week end. Please make sure your systems are on line for the check list. Doug
> _______________________________________________
> Hallb-engineering mailing list
> Hallb-engineering at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hallb-engineering
More information about the Hallb-engineering
mailing list