[Hallb-engineering] Top deck of pie tower

Douglas Tilles tilles at jlab.org
Mon Aug 31 15:25:39 EDT 2015


The top deck of the pie tower will be cleared of all items Tuesday. This is the two racks as well as basket of HV parts for Drift Chambers and all of the old beam-pipes. This is were the LTCC will be storied until installation. 


More information about the Hallb-engineering mailing list