[Hallb-engineering] [New Logentry] Follow-up Re: Hall B Solenoid Cryogenic Tuning

kashy at jlab.org kashy at jlab.org
Fri Dec 29 12:15:02 EST 2017


Logentry Text:
--
Due to the increased load on ESR and at the request of the Cryo Group I have put the controls of back to the previous setup to see if the load goes down on the ESR. If they do not go down or go up then the changes of yesterday helped.
We shall see.

It will take a while to determine this effect, and it could be complicated if other things are changing.

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3508313
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20171229/d0898836/attachment.html>


More information about the Hallb-engineering mailing list