[Hallb-engineering] [Revised Logentry] Ramp to 500 Amps
John Hogan
hogan at jlab.org
Tue Sep 12 14:45:15 EDT 2017
This may be due to the C3 & C4 coils squeezing down on the C1-4 bobbin.
The reaction was fairly uniform (~25lb increase) on both top and bottom radial supports.
----- On Sep 12, 2017, at 2:35 PM, kashy <kashy at jlab.org> wrote:
> Ramp to 500 Amps
> Lognumber 3484211 . Submitted by kashy on Tue, 09/12/2017 - 14:22.
> Last updated on Tue, 09/12/2017 - 14:30 Logbooks: HBSOLENOID
> Noticed that the Z supports all unloaded ~10 lbs. This is likely due to
> stretching of the C5 bobbin
> Also the R supports all loaded during the same time. This is likely due to the
> radial compression of the C5 bobbin.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170912/1f7923a6/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170912_141906.gif
Type: image/gif
Size: 60704 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170912/1f7923a6/attachment-0004.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170912_142757.gif
Type: image/gif
Size: 74511 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170912/1f7923a6/attachment-0005.gif>
More information about the Hallb-engineering
mailing list